Construction Daily Site Log Book
- Author : Holy DAYS
- Publisher : Unknown
- File Size : 55,6 Mb
- Release : 17 March 2021
- ISBN : 9798723516441
- Page : 122 pages
- Rating : 4/5 (21 users)
Summary: Construction Daily Site Log Book PDF is a Fantastic Electronic Book book by Holy DAYS. It was published by Unknown on 17 March 2021. This Book has 122 pages and Available to download in PDF, EPUB and Kindle Format. Read detail book and summary below and click download button to get book file and read directly from your devices.
This practical letter sized (8.5 x 11 inch; 21.59 x 27.94 cm) daily site log has been carefully designed for foremen, forewomen, construction site managers. ★★★Ideal for keeping everything recorded: Space is left at the top of each page so that it can be clipped onto a clipboard. Designed to work with an Electronic Document Management System (EDMS). Simply give each page a document number, take a photograph and upload it directly. Record all important site related activities: weather, deliveries, work stoppages, safety incidents etc. In case of disputes, you can be sure you have the required information thus minimising claim and litigation risks. As long as you give each page its specific dated project number it can be photographed and then uploaded to a electronic document management system (EDMS). All lines in the log book are dark grey, instead of black, so they are less distracting. If you're in construction or dirt work, this record book will help you recall details. You can go back and see the ground conditions, deliveries, contractors, equipment, etc., on site. If you keep up with your paperwork this will meet your needs. This practical letter sized (8.5 x 11 inch; 21.59 x 27.94 cm) daily site log has been carefully designed for foremen, forewomen, construction site managers. ★★★★Record all important site-related activities: Date Project Visitors Weather & Working conditions Contract No Contractor Schedule Accidents/Safty Issues Inspection Day Summary of work/Jobsite Notes Site Conditions Representative Temperature Employee Contractors Subcontractors Equipment Rentals & Materials Received Hindrance To Normal Process Signature Delays/Problems